• Home
  • Photovoltaic engineering
  • Energy storage products
  • Energy storage solutions
  • About Us
  • News and Information
  • Contact Us
  • › News and Information › Company News

    Save 630,000 yuan in electricity bills annually! Tesa 875kW photovoltaic power station launched

    33 Viewed by people 2026.09.29 Guangdong SUNKWH

    Recently, the 875kW distributed photovoltaic project designed and constructed by SUNKWH Company for Desha Bio was successfully connected to the grid and began generating electricity. Desha Bio mainly produces maternal and infant care products, as well as skincare and cosmetics. With the continuous expansion of the company's production capacity, electricity demand is rising. Photovoltaic power can meet the peak daytime electricity usage, substantially replace grid electricity, significantly reduce production energy consumption, and achieve both economic and environmental benefits.

    Save 630,000 yuan in electricity costs annually! Tesa's 875 kW photovoltaic power station is launched, unlocking a new green cost-reduction solution for factories

    This project is located in Sanshui, Foshan, and uses color steel tiles for flat installation. A total of 1,337 Longi high-efficiency modules are installed to convert solar energy into clean electricity, with an annual average power generation of about 870,000 kWh. The overall design is highly adaptable, maximizing the use of roof space and ensuring long-term stable power generation for the power station. The annual average power generation is about 870,000 kWh, with approximately 565 trees planted each year and an annual reduction of carbon dioxide emissions by about 870 tons.

    Save 630,000 yuan in electricity costs annually! Tesa's 875 kW photovoltaic power station is launched, unlocking a new green cost-reduction solution for factories

    In terms of construction, the project overall uses the photovoltaic integrated tile technology. The tiles come with an integrated rail structure, requiring no clamps. The construction uses hidden screws to connect the nut blocks with the pressing pieces, eliminating the need to drill holes on the roof. This method is efficient, improves the overall integrity of the roof, effectively enhances wind and uplift resistance, and reduces the risk of roof leakage.

    Save 630,000 yuan in electricity costs annually! Tesa's 875 kW photovoltaic power station is launched, unlocking a new green cost-reduction solution for factories
    The power station adopts the 'self-generation for self-use, surplus electricity fed into the grid' model. During the day, green electricity consumption can reach up to 80%, covering peak electricity use in workshops and production equipment, effectively reducing production electricity costs, with an estimated annual savings of 630,000 yuan. The completion and commissioning of the photovoltaic power station help the enterprise reduce costs and increase efficiency, build a green factory, and enhance the company's low-carbon development image.

    Save 630,000 yuan in electricity costs annually! Tesa's 875 kW photovoltaic power station is launched, unlocking a new green cost-reduction solution for factories

    Share: WeChat Weibo Douyin Facebook Instagram Twitter

    ← Back to News List

    Contact Information:400-900-8760
    Address:Entire 7th floor, Block C, Kechuang Yun Zhihui, Foshan West Station, Foshan City, Guangdong Province
    WeChat public account QR codeWeChat Official Account
    WeChat Channels QR CodeWeChat Video Channels